Transportation of oversized cargo up to 100+ tons
Machine tools, industrial equipment, construction equipment - we deliver what does not fit into a standard truck. We fix the cost before shipping. We take care of the permits and route.
Why large size is difficult
Standard freight forwarders refuse oversized items or add unpredictable surcharges. This is exactly what we specialize in.
Incomprehensible total cost: permits, escort, crane - everything is added separately
Permits take 5–10 days and delay shipping
Fear of damage during non-standard loading and difficult routes
Not all routes allow oversized cargo: bridges, tunnels, height restrictions
We fix the full cost before shipment: freight + permits + loading + insurance - no hidden extras along the way
We apply for a permit in parallel with the preparation of transport - no time is wasted waiting
Specialized securing for the type of cargo, support along the route and mandatory insurance
We plan the route in advance, taking into account restrictions. There is always an alternative route
How to reduce the cost of transporting oversized items
Five tricks that save money and time.
Disassembly
Disassembling means saving
If the equipment is disassembled to standard dimensions (up to 20 m × 2.55 m × 4.0 m), special permits are not required. The cost of permits is from $500, the wait is 5–10 days. Plus, standard freight is 30–50% cheaper than oversized freight.
Permissions
Permits are expired
Special permits for the transportation of oversized items are valid for 1–3 months. If you delay sending it, the permit will expire and you will need to get a new one. We prepare the transport and issue the permit at the same time, saving up to 10 days.
Insurance
Insurance for oversized cargo is different
The standard rate of 0.3% does not work for large cargo. Correct rate: 0.5–1.5% depending on the category of cargo. One incorrectly insured flight can cost hundreds of thousands of dollars.
Weight
Up to 10 tons - more profitable than LTL
Most shippers of large cargo automatically take dedicated transport. But up to 10 tons or 30 m³, LTL groupage is often cheaper. Dedicated transport is needed from 15+ tons or with strict time requirements.
From order to delivery
At each key stage - notification in the messenger: departure, border, customs, delivery. GPS tracking along the route.
- 01
Assessment and calculation
Send dimensions, weight and photo of the cargo. In 1–2 business days you receive the cost and transportation plan with a fixed price.
1–2 days - 02
Route and permissions
We plan a route taking into account the restrictions. At the same time, we issue special permits for oversize items - we don’t waste time waiting sequentially.
5–10 days - 03
Loading and securing
Specialized fastening for the type of cargo. Photo recording before shipping. If necessary, a crane or rigging at the loading site.
1–2 days - 04
Delivery and customs
Movement with escort if necessary. GPS tracking and notifications at every key point. Customs clearance and turnkey delivery.
10–25 days
Frequently Asked Questions
Frequently asked questions about the transportation of large and heavy cargo
